See what your land could become.
Keystone prepares early development studies for sites in India and the USA. Compare site information, planning options, indicative cost, timeline and feasibility against your brief.
What is Keystone?
Keystone studies land, tests whether a site works, and sets out the development options. Each option shows the assumptions, costs and schedule behind it. The study covers housing, mixed-use, commercial and data-centre sites, from mid-rise to high-rise, in the USA and India.
What does it do?
Our team reviews the land, explores planning options and compares indicative cost, timeline and feasibility against your brief. The scope and inputs are agreed for each study. See AI for real estate development.
Who is it for?
Developers who decide whether to buy or build on a site, and teams that fund or advise them. Data-centre developers can use the same study to check power, fibre, water and flood on one parcel. See data centre feasibility.
Which rules does it use?
In India: RERA, NBC and CPWD. In the USA: the IBC plus city and county zoning, including floor area ratio (FAR). The study names the source it used where one is available and marks missing items as unknown. It does not issue a compliance certificate. A licensed professional still does that. More answers in the FAQ.
How do I start?
Send an enquiry with the site location, boundary and what you want to assess. Our team discusses your requirements and agrees the scope and price for the study.
What the study covers
Site information
We review available information about the boundary, access, applicable land-use rules and site constraints. The study identifies missing inputs that need further checking.
Planning options
We explore development options against the brief and the information available for the site. The study shows the assumptions and the limits of the comparison.
Cost and feasibility
We bring the planning assumptions into an indicative cost, timeline and feasibility comparison. The scope and inputs are agreed for each study.
See what supports the comparison
A useful decision starts with clear inputs. The study identifies the sources and assumptions used, and flags information that still needs checking. Local rules, title, utility capacity and technical requirements need confirmation from the relevant authorities and professionals.
- Sourced
Taken from a named rule or dataset. The source is shown next to the number.
- Assumed
A stated assumption, shown as an assumption so you can review it.
- Unknown
The information is missing, so the study says unknown and lists it for further checking.
One result line
- Result
- Maximum floor area for the parcel
- Rule
- The zoning rule that applies to this parcel
- Source
- Authority, document and section, shown
- Inputs
- Your site boundary and the values you set
- Status
- Sourced · Assumed · Unknown
One study. Every kind of site.
Any site decision starts with the same question: what can this land become, and what will it cost? Pick the kind of project you are testing.
From enquiry to a reviewed study
Send an enquiry
Share the site location, boundary and what you want to assess.
Agree the brief
Our team discusses the available inputs and the study scope with you.
Review the study
Compare the options, assumptions, indicative costs and outstanding checks.
AI for real estate and data centre development, explained
Plain answers for India and the USA: what AI can do, what to check, and where it stops.
Questions worth asking before you talk to us
How is Keystone different from a feasibility consultant?+
Keystone prepares a study from a site boundary and your brief: planning options, indicative cost, timeline, and a feasibility and underwriting report. The scope and inputs are agreed for each study.
Is Keystone's output code-compliant?+
Keystone's layouts are generated against prescriptive zoning and building-code provisions. It does not issue a compliance certification — that remains a licensed professional's role.
How long does a Keystone feasibility report take?+
The team reviews land information, master planning, and feasibility and underwriting together, using the same inputs. The scope is agreed for each study.
What geographies does Keystone cover?+
USA and India. India coverage is RERA/NBC/CPWD-aware; USA coverage is IBC plus jurisdiction-specific FAR and zoning rules, not a national average. Built for India and the USA from the start, not ported from one market to the other.
We're not building a better version of the old process. We're building what replaces it.
Run a real site through Keystone and see the output for yourself.
